Monthly good output—
Demand coverage—
Warehouse utilisation—
OEE—

Industrial Health

This is the quick message for a non-technical worker: it says what needs attention first. Green means the main numbers are okay; amber means caution; red means action is urgent.

System Map

Industrial flowMathematical layer
Raw materialsStochastic demand + inventory control
ProductionCapacity + OEE + dynamic state model
WarehouseCapacity + queue/flow model
UtilitiesLoad dynamics + energy economics
DistributionFleet + stochastic travel/cycle model
UncertaintyMonte Carlo / SDE / Markov chain
OptimizationNonlinear constrained optimization

Production Capacity Model

Enter normal operating numbers. The advanced uncertainty model is in the Mathematics Lab.

How many production lines are available.
How many machines are working on each line.
How many items one machine can make in one hour.
How long one shift lasts.
How many shifts happen every day.
How many days the plant works this month.
How much working time is lost because machines stop.
How close production speed is to the best planned speed.
How much product remains after process losses.
How much finished product passes inspection.
How many units customers are expected to need.
Time lost when changing from one product/order to another.

Live Production Result

Think of this as: “How much can the factory really make, after stopping, slowing down, process losses and rejected products?” If good output is below demand, the factory may not make enough.
Decision AnalysisBusiness impact
Waiting for live calculation...

Inventory Optimization

How many units are expected to be used or sold in a year.
Money spent each time a new order is placed.
Cost of keeping one item in the store for a year.
Money value of one stored item.
How many days you normally wait for the new stock to arrive.
How much daily demand normally moves up and down.
How much delivery time normally moves up and down.
How strongly we want to protect against running out of stock.
How many items are currently available.

Inventory Decision

EOQ tells you roughly how much to order at one time. Safety stock is extra stock kept as protection. Reorder point tells staff when it is time to order again. If current stock is below the reorder point, action may be needed.
Decision AnalysisWorking-capital & service
Waiting for live calculation...

Warehouse Capacity

How much floor space the warehouse has.
The part of the building that can actually hold goods.
The storage level we prefer not to exceed for smooth work.
Floor space needed by one pallet.
How many pallets can safely be stacked above each other.
How many pallets are there now.
How many pallets enter every day.
How many pallets leave every day.
How far ahead we are looking.

Warehouse Result

This tells staff whether the warehouse is likely to become too full. Green means there is room. Amber means the warehouse is getting crowded. Red means the projected stock may exceed available capacity.
Decision AnalysisSpace & flow
Waiting for live calculation...

Energy & Utility Model

The maximum power the equipment could use.
How much of the available electrical power is used on average.
How many hours the plant uses power each day.
How many days the plant operates this month.
How much one unit of grid electricity costs.
How much of the power comes from the grid.
How many electricity units one litre of fuel produces.
Price of one litre of fuel.
Estimated carbon released per litre of fuel.

Energy Result

This tells staff how much electricity is needed, how much comes from the grid or generator, and how much money is spent. It also estimates generator fuel and CO₂.
Decision AnalysisCost & continuity
Waiting for live calculation...

Fleet & Transport Model

How far the truck travels one way.
How many trips happen each day.
How many tonnes one truck carries.
How far the truck goes with one litre.
Price of one litre of truck fuel.
Typical truck speed on the route.
Time spent loading and unloading the truck.
How many days trucks work this month.
Average repair and maintenance money per kilometre.

Logistics Result

This shows how far trucks travel, how much fuel they use, how many tonnes they move and what each tonne costs. Lower cost per tonne is generally better, provided service and safety are maintained.
Decision AnalysisTransport economics
Waiting for live calculation...

Quality, OEE & Maintenance

Total time the factory planned to produce.
Time the machine actually ran.
All pieces made, good and bad.
Best possible time for one piece.
Pieces accepted as good.
Average time the machine runs before failing.
Average time needed to repair a failure.
How many maintenance events happen each month.
Average money spent per maintenance event.

OEE Result

Availability asks “Did the machine run when it should?” Performance asks “Did it run fast enough?” Quality asks “Did it make good products?” OEE combines all three.
Decision AnalysisReliability & quality
Waiting for live calculation...

Scenario Lab

Stress the industrial system with changes in demand, capacity, supply lead time and transport disruption.

How much customer demand suddenly increases.
How much production ability is lost.
Extra days we must wait for materials.
How much transport becomes more expensive or difficult.

Scenario Result

This is the “what if something goes wrong?” screen. It helps management see the effect of a demand jump, production loss, late materials or transport disruption before the real event happens.
Decision AnalysisRisk & resilience
Waiting for scenario...
Advanced Mathematics Layer. The operational screens intentionally use simple language. This section shows the deeper mathematical structures behind the decision engine. These are model classes and numerical approximations—not claims that every industrial site obeys one exact equation. Calibration with plant data is required before operational deployment.

1. Stochastic Production & Inventory Dynamics

$$dX_t=\mu(X_t,u_t,t)\,dt+\Sigma(X_t,u_t,t)\,dW_t$$

Interpretation: \(X_t\) is the industrial state (inventory, WIP, machine health, queue length, etc.). \(\mu\) is the predictable drift. \(\Sigma\) describes random variation. \(W_t\) is a vector Wiener process. This is a stochastic differential equation (SDE).

How many items we start with.
Average number of items leaving stock each day.
How much daily demand can randomly move up or down.
Average number of items added each day.
How many future days to simulate.
How many possible futures are tested.

2. Nonlinear Optimization

$$\min_{x\in\mathbb R^n} f(x)=c^\top x+\frac12x^\top Qx+\lambda\sum_i x_i^2\log(1+x_i)$$

The engine demonstrates constrained nonlinear optimization with non-negativity bounds. In a production implementation, \(x\) can represent production allocation, inventory targets, energy dispatch or transport allocation.

How much production is assigned to option 1.
How much production is assigned to option 2.
Minimum total amount we want from both options.
Extra penalty when allocation becomes large.

3. Multivariable Queueing

$$\rho=\frac{\lambda}{c\mu},\qquad L_q=P_{\!wait}\frac{\rho}{1-\rho},\qquad W_q=\frac{L_q}{\lambda}$$

For a multi-server station, this uses the Erlang-C structure as a baseline. Multiple service classes can be evaluated side-by-side. When \(\rho\ge1\), the ideal steady-state queue is unstable.

How many jobs arrive each hour.
How many jobs one worker or machine can handle per hour.
How many service points work at the same time.
Arrivals per hour for the second type of job.

4. Multivariable Markov Chain

$$\boldsymbol\pi_{k+1}=\boldsymbol\pi_kP,\qquad \boldsymbol\pi^\*=\boldsymbol\pi^\*P,\qquad \sum_i\pi_i^\*=1$$

States can represent Healthy, Degraded and Failed equipment. The transition matrix describes probabilities of moving between states in one time step.

5. Differential Equations

$$\frac{dI}{dt}=R(t)-D(t)-\delta I(t)$$

A dynamic inventory balance: replenishment enters, demand leaves, and \(\delta I\) represents proportional loss, decay or leakage. Euler integration is shown here; higher-order solvers can be used in a calibrated implementation.

How many items we start with.
How many items are added each day.
How many items leave each day.
Small fraction of stock that may be lost each day.

6. Fourier Series / Seasonal Demand

$$D(t)=a_0+\sum_{n=1}^{N}\left[a_n\cos(n\omega t)+b_n\sin(n\omega t)\right]$$

Fourier decomposition represents periodic demand as a combination of harmonics. It is useful when demand has weekly, monthly or seasonal cycles.

The normal average demand.
Size of one repeating demand wave.
Another part of the repeating demand wave.
How many days before the pattern repeats.

7. Laplace Transform / Dynamic Response

$$G(s)=\frac{K}{\tau s+1},\qquad y(t)=K\left(1-e^{-t/\tau}\right)u(t)$$

Laplace transforms convert differential equations into algebraic equations in \(s\). This first-order transfer function can represent a simplified response of inventory, temperature, pressure, flow or production rate.

How large the final response becomes.
How quickly the system reacts.
The size of the sudden change.

8. Jacobian Sensitivity Analysis

$$J_{ij}=\frac{\partial y_i}{\partial x_j},\qquad \Delta y\approx J\,\Delta x$$

The Jacobian measures how strongly outputs change when inputs change. The engine uses central finite differences around the current operating point.

9. Real Analysis: Continuity & Stability

$$\forall\varepsilon>0\;\exists\delta>0:\ |x-x_0|<\delta\Rightarrow |f(x)-f(x_0)|<\varepsilon$$

Real analysis provides the language for limits, continuity, convergence and stability. Here we numerically inspect a cost function and estimate a local Lipschitz slope.

The current operating level.
How close to the current point we test.

10. Abstract Algebra & Group Theory

$$\sigma,\tau\in S_n,\qquad(\sigma\circ\tau)(i)=\sigma(\tau(i))$$

Production sequencing can be viewed as permutations of jobs. The symmetric group \(S_n\) contains all permutations of \(n\) jobs, with composition as the operation and the identity permutation as the neutral element.

Number of jobs in the sequence.
A new order of the jobs, such as 2,3,1,5,4.

11. Topological Spaces / Network Connectivity

$$\mathcal T\subseteq\mathcal P(X),\quad \varnothing,X\in\mathcal T,\quad U,V\in\mathcal T\Rightarrow U\cap V,U\cup V\in\mathcal T$$

Topology studies properties preserved under continuous deformation. For an industrial network, a useful applied analogy is connectivity: whether factories, warehouses and utilities remain connected under failures.

Number of places or machines in the network.
Chance that two locations have a direct connection.

Executive Model Report

This report turns the model into a management message: what the factory can make, whether stock is safe, whether the warehouse may become crowded, what energy and transport cost, and whether machines are performing well.